I've had trouble doing my first laminate coat. I either didn't mix enough catalyst in and the room temp was too low (@18 degrees celsius). Either way it has taken about 5 days now for it to start to cure. In the mean time, whilst I was away at work, Clare had its heaviest rainfall all summer and the shed I was working in proved it wasn't water tight!! I don't know whether it was humidity or some actual rain drops but I now have 3 very small areas of delamination (approx 1 euro coin in size) on the bottom. Is this a sign of things to come with the rest of this laminate coat?? Time to call the experts me thinks!!